Search scope:
排序: Display mode:
Frontiers of Structural and Civil Engineering Pages 827-854 doi: 10.1007/s11709-023-0954-1
Keywords: seismic performance continuous girder bridge grouting sleeve-prestressed tendon composite connections
Hanli WU, Hua ZHAO, Jenny LIU, Zhentao HU
Frontiers of Structural and Civil Engineering 2020, Volume 14, Issue 5, Pages 1232-1246 doi: 10.1007/s11709-020-0653-0
Keywords: bridge weigh-in-motion continuous bridge fast Fourier transform influence line axle weight calculation
Elmira SHOUSHTARI, M. Saiid SAIIDI, Ahmad ITANI, Mohamed A. MOUSTAFA
Frontiers of Structural and Civil Engineering 2020, Volume 14, Issue 1, Pages 169-184 doi: 10.1007/s11709-019-0590-y
Keywords: shake table test accelerated bridge construction steel girder bridge OpenSEES UHPC simple for dead continuous
Minghong QIU; Xudong SHAO; Weiye HU; Yanping ZHU; Husam H. HUSSEIN; Yaobei HE; Qiongwei LIU
Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 6, Pages 744-761 doi: 10.1007/s11709-022-0843-z
Keywords: field test steel-concrete composite beam continuous girder bridge negative bending moment region
Qi Zhaochen,Tang Maolin,Cui Bing,Dong Meng,Wang Ming
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 37-41
It is a difficult technical problem to make sure that the curve of girderconnecting the segments near the tower rigidly and transferring structure system for the suspension bridgewith three-span continuous stiffening girder.in this paper, and by taking a suspension bridge of over 1 000 m with three-span continuous stiffeninggirder as an example, the system transformation, curve adjustment and construction control of the girder
Keywords: suspension bridge stiffening girder region without hangers curve
Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 54-59
Unlike single-span suspension bridge,the three -span continuous suspensionbridge is mainly characterized by slings set in both side spans, and the continuous transition of stiffeningthe lifting method and key construction process for the stiffening girders of the type of suspension bridgeis relatively complex. the Fourth Nanjing Yangtze River Bridge as the background, and according to thestructural features of the large span three-span continuous suspension bridge, the reasonable lifting
Keywords: three-span continuous suspension bridge steel box girder lifting program closure saddle pushing
Stress analysis of deck pavement of continuous steel box girder
Li Guofen,Cao Mu, Wang Hongchang,Zhu Huaping
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 79-83
Keywords: bridge deck pavement curved continuous steel box girder surfacing cracking bond slip stress and the
Precast steel–UHPC lightweight composite bridge for accelerated bridge construction
Shuwen DENG, Xudong SHAO, Xudong ZHAO, Yang WANG, Yan WANG
Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 2, Pages 364-377 doi: 10.1007/s11709-021-0702-3
Keywords: accelerated bridge construction ultrahigh-performance concrete steel–UHPC composite bridge UHPC girder-to-girder
Experimental monitoring of the strengthening construction of a segmental box girder bridge and field
Ali Fadhil NASER, Zonglin WANG
Frontiers of Structural and Civil Engineering 2012, Volume 6, Issue 3, Pages 308-320 doi: 10.1007/s11709-012-0140-3
Keywords: prestressed concrete box girder monitoring external tendons strain deflection
Yuji CHEN, Qizhi LUO,
Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 4, Pages 352-356 doi: 10.1007/s11709-009-0057-7
Keywords: thin-walled box girder with variable cross-sections potential variational theory shear lag large deflection
Vibration testing of a steel girder bridge using cabled and wireless sensors
Dapeng ZHU, Yang WANG, James BROWNJOHN
Frontiers of Structural and Civil Engineering 2011, Volume 5, Issue 3, Pages 249-258 doi: 10.1007/s11709-011-0113-y
Keywords: wireless sensing structural health monitoring (SHM) signal conditioning operating deflection analysis ambient vibration
Research of steel box girder dehumidification in Taizhou Bridge
Li Lin and Xu Jun
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 10-13
The steel box girder of Taizhou Bridge is 2 160 m long with volume ofThe paper analyzes the principle, lectotype, setting, workflow and construction of the steel box girderAnd the paper protocols the quality inspection and evaluation standards of the steel box girder dehumidificationin Taizhou Bridge.
Keywords: Taizhou Bridge steel box girder dehumidification research
Design of stiffening girder for Taizhou Bridge
Shan Hongwei,Ding Lei,Zhou Qing
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 4-9
Taizhou Bridge is the first three-tower two-span suspension bridge withThe structural system of the stiffening girder is complicated and unique.Improvement and innovation have been made in detailed structure design of the stiffening girder basedon Runyang Bridge according to the structural character of three-pylon two-span suspension bridge.structural system, structure design, structure calculation, manufacturing and erection of the stiffening girder
Keywords: suspension bridge stiffening girder structural system structure design
Ali Fadhil NASER, Zonglin WANG
Frontiers of Structural and Civil Engineering 2013, Volume 7, Issue 2, Pages 164-177 doi: 10.1007/s11709-013-0196-8
Keywords: structural performance steel plates external pre-stressing cracks grouting method static
Closure technique for the hybrid girder cable-stayed bridge of Edong Bridge
Liu Minghu,Tan Hao,Xu Guoping,Zhao Canhui
Strategic Study of CAE 2011, Volume 13, Issue 10, Pages 99-104
Based on Edong Bridge, which is the second longest hybrid girder cable-stayedbridge with 926 m long main span,the influencing factors and crucial techniques of the main span closuremethod for long span hybrid girder cable-stayed bridge are studied.The loading assistant closure method, with better thermal adaptability and less influence on bridge lineon the mentioned advantages,the loading assistant closure method is applicable to long span hybrid girder
Keywords: Edong Bridge hybrid girder cable-stayed bridge closure technique loading assistant closure method
Title Author Date Type Operation
Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite
Journal Article
A filtering-based bridge weigh-in-motion system on a continuous multi-girder bridge considering the influence
Hanli WU, Hua ZHAO, Jenny LIU, Zhentao HU
Journal Article
Pretest analysis of shake table response of a two-span steel girder bridge incorporating acceleratedbridge construction connections
Elmira SHOUSHTARI, M. Saiid SAIIDI, Ahmad ITANI, Mohamed A. MOUSTAFA
Journal Article
Field validation of UHPC layer in negative moment region of steel-concrete composite continuous girderbridge
Minghong QIU; Xudong SHAO; Weiye HU; Yanping ZHU; Husam H. HUSSEIN; Yaobei HE; Qiongwei LIU
Journal Article
The curve adjustment method of girder segments without hangers for suspension bridge with three-spancontinuous stiffening girder
Qi Zhaochen,Tang Maolin,Cui Bing,Dong Meng,Wang Ming
Journal Article
Study on overall lifting program for steel box girder of large span of three-span continuous suspensionbridge
Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran
Journal Article
Stress analysis of deck pavement of continuous steel box girder
Li Guofen,Cao Mu, Wang Hongchang,Zhu Huaping
Journal Article
Precast steel–UHPC lightweight composite bridge for accelerated bridge construction
Shuwen DENG, Xudong SHAO, Xudong ZHAO, Yang WANG, Yan WANG
Journal Article
Experimental monitoring of the strengthening construction of a segmental box girder bridge and field
Ali Fadhil NASER, Zonglin WANG
Journal Article
Mechanics analysis of thin-walled box continuous girder with variable cross-sections in considering effect
Yuji CHEN, Qizhi LUO,
Journal Article
Vibration testing of a steel girder bridge using cabled and wireless sensors
Dapeng ZHU, Yang WANG, James BROWNJOHN
Journal Article
Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girderbridge after repairing and strengthening
Ali Fadhil NASER, Zonglin WANG
Journal Article